This inspection is very important because structural faults can be detected quite easily at this stage which means the builder can make good without issue. This inspection should be carried out once the brickwork is complete and prior to the roof carpenter commencing.

Our report provides a comprehensive overview of the following (but not limited to) areas:

  • Window and door frames correctly located
  • Termite barrier installed to boundary walls
  • Flashings correctly installed
  • Weep holes correctly installed and positioned
  • Brick ties and roof tie downs correctly spaced
  • Brickwork true
  • Room sizes correct
  • Cavity columns installed as per engineering spec
  • Correct brickwork used over large openings
  • Coastal conditions