Services and Prices

A Comprehensive Range of Consultancy and Inspection Services Tailored for Your Project

Pre-Purchase Inspections

Pre-Purchase Standard (Structural) Building and Timber Pest Inspection

Pre-Purchase Standard (Structural) Building and Timber Pest Inspection

The Standard Pre-Purchase Inspection Report investigates and reports primarily into the structural elements of the building, giving you peace of mind that your new in investment is structurally sound.

More Information
Pre-Purchase Comprehensive Building and Timber Pest Inspection

Pre-Purchase Comprehensive Building and Timber Pest Inspection

The Pre-Purchase Comprehensive Inspection Report investigates and reports primarily into the structural elements of the building. Additionally, many second and third fit areas are covered including exterior spaces, driveways, electrics, appliances and plumbing.

More Information

Build Inspections

Slab Inspection

Slab Inspection

The slab inspection includes an inspection when the slab is in position prior to brickwork commencing. Most of the items being inspected at this stage will not be accessible for inspection at a later date as they will be covered over by the building fabric.

More Information
Brickwork Completion

Brickwork Completion Inspection

This inspection is very important because structural faults can be detected quite easily at this stage which means the builder can make good without issue. This inspection should be carried out once the brickwork is complete and prior to the roof carpenter commencing.

More Information
Roof Frame Inspection

Roof Frame Inspection

A roof frame inspection is the final inspection carried out in the build before a practical completion. A roof inspection ensures your property is structurally sound .

More Information
Practical Completion

Practical Completion Inspection

This is a thorough inspection of the completed items including the aesthetics of the home. This inspection is best done prior to your Practical Completion Inspection with your builder allowing you to be prepared for the meeting.

More Information
Defects Liability Period

Defects Liability Period Inspection

The defect liability period is compulsory with all new built homes. This can be either 4 month or 6 month after handover depending on what has been contractually agreed with your builder.

More Information